Home Application Cases Environmental Doctor Service Cases Municipal Wastewater Plant Rapid Nitrification Recovery Project
Municipal Wastewater Plant Rapid Nitrification Recovery Project

Solution:MicroMotion®-N was applied to rapidly restore the nitrification system and stabilize effluent performance under the influence of toxic substances in the aerobic zone of the biological tank.

Processing Scale:120000m³/d

Treatment Effect:Ammonia nitrogen in the effluent was stabilized at ≤ 1 mg/L within 20 hours.

Plant Profile

Municipal Wastewater Plant.jpg

Description

Based on the treatment capacity, influent pH, dissolved oxygen levels in the aerobic zone, temperature, sludge settling ratio, sludge concentration, and influent/effluent water quality parameters, it was determined that the influent wastewater contained excessive toxic substances, causing a large-scale die-off of nitrifying bacteria, which in turn affected the ammonia nitrogen levels in the effluent.


Option

(1) Conducted a bench-scale test using a mixture of oxidation ditch sludge and water to assess the situation, followed by on-site process adjustments based on the test results.
(2) Applied microbial agents: Used MicroMotion
®-N to improve sludge activity and quickly establish a stable nitrification system.


Result

时间

1#样

2#样

反应时长

2023.6.22  13:00

20.6mg/L

20.8 mg/L

0

2023.6.22  16:00

16.35 mg/L

16.25 mg/L

3h

2023.6.23  9:00

0.34 mg/L

0.24 mg/L

20h

After inoculating MicroMotion®-N, the effluent ammonia nitrogen concentration was reduced to ≤1 mg/L within 20 hours.


Periodic Service

环保医生服务项目全周期服务.jpg